Current Factory viewer · Native task definitions

Invalid instrumentation diagnostic

This recording is excluded from every policy outcome. The first LMBoxLift pilot revealed that native overview rendering could advance PhysX between commanded control steps. Its nominal20-second/50fps recording is therefore not a valid50Hz control reference. The recorded timeout must not be counted as a GR00T failure.

The original video is retained to document the issue. A render-only guard and direct native physics-state/counter checks are required for replacement pilots and every final trial.

Invalidation receipt · Earlier record-consistency audit (superseded)

No success rate, failure rate or model-superiority inference is made from this recording.